Your location:
Home >> Products >> Power equipment products
General contracting of power engineering
Our company has a Level 3 qualification for general contracting of power engineering construction, and can complete the overall construction of units ...
Product Introduction:
Our company has a Level 3 qualification for general contracting of power engineering construction, and can complete the overall construction of units with a single unit capacity of 100000 kilowatts and below, transmission lines with a voltage level of 110 kilovolts and below, and substations with the same voltage level.
|